Bethel conducted an investigation and removal action of soil near a vehicle garage floor drain outfall at Mica Peak, Washington.
Shreveport Soil Remediation
Nome Tank Demolition and Contaminated Soil Removal
Contaminates Removal Action at Black Rapids Airstrip
Woody Island Lead-Contaminated Soil Removal
Removal Action for Abandoned Drums
Atka Cape Kudugnak BD/DR, CON/HTRW Removal, and SI
Granite Mine Drum Removal
Galena Interim Removal Action and Landfarm Expansion
Pt. McIntyre Remediation Support
Bethel was subcontracted by Tetra Tech to complete a selected remedy and removal action for relocation and cleanup of the Eroding Landfill at the former Distant Early Warning (DEW) Line Station at Point McIntyre, Alaska located approximately 15 miles northwest of Deadhorse, Alaska on the North Slope.